Rhode Island DOT e‑ticketing requirements

Required statewideRhode Island Department of Transportation (RIDOT)

Last verified September 26, 2026

RIDOT's Standard Specifications, Section 941, require electronic tickets for all loads of hot mix asphalt and ready-mixed concrete delivered to the project. The section first appears in the August 2024 edition and is still in the August 2026 edition. RIDOT can fine $10 per ton of HMA or per cubic yard of concrete when e-tickets are not issued as specified.

Required statewide: The DOT requires e-tickets on all its contracts for at least one material, most often asphalt.

Key dates

August 2024
Section 941 e-Ticketing first appears in the RIDOT Standard Specifications (Blue Book) August 2024 edition; the February 2024 edition lists Section 941 as reserved.
August 2026
Section 941 still in the August 2026 edition.

Materials and project scope

  • Hot mix asphalt
  • Ready-mixed portland cement concrete

All RIDOT-awarded contracts using the Blue Book edition that includes Section 941, unless modified by contract special provisions. Other materials by mutual agreement of Contractor and Engineer.

Spec references

  • Section 941: RIDOT Standard Specifications for Road & Bridge Construction, Section 941 e-Ticketing (August 2025 edition)
  • Section 110 Fines/Charges Table: e-Ticketing HMA $10.00 per ton; e-Ticketing Concrete $10.00 per CY

Data requirements

All materials: date, RIDOT project number and name, prime contractor, supplier, unique truck ID, ticket number, plant/scale name, loaded (batched) time, other truck status times as available. PCC adds water/cement data, batch weights, admixtures, cementitious materials, CPI name and certificate number. HMA adds mix design number, class of mix, modified/unmodified, gross, tare, and net weight, and cumulative tonnage for the paving session. Supplier uptime 99.5% over 30 days; tickets received within 10 minutes.

What contractors should do

  1. Test each HMA and ready-mix supplier's connection to the RIDOT e-Ticketing Portal at least 14 days before shipping, with at least four calibration e-tickets.
  2. Confirm suppliers can meet 99.5% uptime and 10-minute ticket delivery.
  3. Price API, ticket data, and truck numbering into the placed item; RIDOT does not pay for e-ticketing separately.
  4. Budget for the Section 110 fine ($10 per ton HMA or per CY concrete) if e-tickets are not issued as specified.
  5. Expect paving to stop at the end of the session if e-tickets stop; paper is allowed only until then.

What haulers should do

  1. Display identifying vehicle numbers so at least one can be read safely from the work area; trucks without them are rejected.
  2. Make sure the truck ID on each e-ticket matches your truck.