Indiana DOT e‑ticketing requirements

OptionalIndiana Department of Transportation (INDOT)

Last verified September 26, 2026

INDOT accepts e-tickets but does not require them: Standard Specification 106.01(b)2 says a delivery ticket may be paper or electronic. INDOT stopped licensing HaulHub's EDOT portal effective June 30, 2026, per Construction Memorandum 26-04 (May 13, 2026). Contractors can still ask to use their own e-ticketing system if it meets the spec's requirements.

Optional: The contractor can choose e-tickets instead of paper tickets.

Key dates

June 15, 2023
RSP 106-C-280 E-Ticketing Incentive adopted ($2.00 per e-ticket delivered to MyDOTportal, for asphalt, concrete, or aggregate)
September 1, 2025
Revised RSP 106-C-280 effective (Standards Committee, Feb 21, 2025)
June 30, 2026
INDOT discontinues HaulHub EDOT e-ticketing portal licensing (CM 26-04)

Materials and project scope

  • Hot mix asphalt
  • Concrete
  • Aggregate

Optional on all INDOT contracts. The incentive RSP's proposed basis for use was all contracts except LPA-sponsored contracts.

Spec references

E-ticketing platform

  • HaulHub EDOT / MyDOTportal (licensing ended 2026-06-30)

Data requirements

Tickets must show itemized quantity, delivery date, contract number, source of supply and source code, and data needed for basis of use (106.01(b)2); weight tickets add serial number, material designation, DMF/JMF for HMA, truck number, time weighed, gross, tare, net, moisture if applicable (109.01). An alternate e-ticketing system needs a user guide, real-time access on macOS, Windows, iOS, and Android, real-time delivery acknowledgment by INDOT, compiled PDF tickets and summaries by date and material, and download or email access. CM 26-04 says the real-time acknowledgment requirement will apply only to tickets that are the basis of payment, and the spec will be revised.

What contractors should do

  1. If you want to use e-tickets, request Engineer approval of your own system under 106.01(b)2, since INDOT's portal is no longer licensed.
  2. Confirm your system can compile tickets and daily summaries into PDF by date and material.
  3. For materials paid by delivered quantity, confirm INDOT staff can acknowledge each delivery in real time.
  4. Give the Engineer every delivery ticket by the next business day; undocumented material is not paid.
  5. Do not count on the $2.00 incentive under RSP 106-C-280 without confirming with INDOT, because the RSP requires delivery to MyDOTportal.

What haulers should do

  1. Expect paper tickets on most INDOT work; INDOT can demand paper at any time if e-tickets fail.
  2. Keep truck numbers on tickets; they are a required field.