Florida DOT e‑ticketing requirements

OptionalFlorida Department of Transportation (FDOT)

Last verified September 26, 2026

FDOT's Standard Specifications let the contractor use either a paper ticketing system or an electronic ticketing (E-Ticketing) system for hot-mix asphalt (Section 320-3.2). The Engineer must get real-time access and a daily summary when e-ticketing is used. FDOT does not require e-tickets on all contracts, and no FDOT requirement for concrete or aggregate e-tickets was found.

Optional: The contractor can choose e-tickets instead of paper tickets.

Key dates

April 2020
FDOT contactless-ticketing memo (DCE Memo 20-14) during COVID allows e-ticketing and other no-contact methods
July 23, 2021
DCE Memo 21-10 / Materials Bulletin 21-07: asphalt e-ticketing spec may be added at the contractor's request by $0 change
July 2025
FY 2025-26 Standard Specifications include 320-3.2 paper-or-e-ticketing option (verified; the change was proposed in the FY 2023-24 cycle)
July 2026
FY 2026-27 Standard Specifications keep the same option

Materials and project scope

  • Asphalt

All FDOT contracts under the Standard Specifications for Road and Bridge Construction, at the contractor's option, for plant-produced hot-mix asphalt.

Spec references

  • 320-3.2 / 320-3.2.2: Asphalt Plant Ticketing Systems; Electronic Weigh Systems for E-Ticketing (FY 2026-27 Standard Specifications)
  • 330-2.1 item 6: Hot Mix Asphalt General Construction Requirements: tablet on site running the e-ticketing software when E-Ticketing is used
  • DCE Memo 21-10 / MB 21-07: Asphalt Ticketing (July 23, 2021, FHWA approved 07/22/2021)

Data requirements

Electronic delivery ticket minimum: sequential load number, project Financial Identification Number (FIN), date, plant name and location, mix design number, separate mix temperature entries, truck number, gross/tare/net tonnage, and daily cumulative tonnage. The system uploads each load by web service, integrates with the plant's load read-out scale, works offline, and gives the Engineer a real-time viewer (truck ID, load number, mix design, net weight and running total to 0.01 ton, FIN, project location). A daily summary is due within 4 hours of starting work the next working day, plus monthly and end-of-project reports in the software and as CSV. When used, the contractor provides a tablet at the paver and enters e-ticket data into the Asphalt Roadway Daily Report of Quality Control.

What contractors should do

  1. Decide per project whether to use paper or E-Ticketing under 320-3.2, and tell the Engineer before paving.
  2. If you choose e-ticketing, confirm the system integrates with the plant's load read-out scale, works offline, and gives the Engineer a real-time viewer.
  3. Provide a tablet at the paving operation running the e-ticketing software (330-2.1).
  4. Deliver the daily summary within 4 hours of starting the next working day, and monthly and final CSV reports.

What haulers should do

  1. Make sure your unique truck ID matches the one on the e-ticket.
  2. Expect paper tickets on FDOT jobs where the contractor has not chosen e-ticketing.